6

I am trying to do a Photoshop tutorial which seems easy, but I do not understand one phrase:

"First, I add a curved layer and create a slanted S"

What does 'slanted S' mean? Maybe I should "write" S in the curves editor?

The tutorial is big, and you can use Ctrl+F to find an occurrence of these words in the text. I just don't understand the meaning of "Slanted S". It's my assumption that it means to draw an S-shaped curve.

taylor.2317
  • 103
  • 4

2 Answers2

16

The curves tool stretches or compresses ranges of input tones according to the line you draw. Because it represents a mapping, it's nonsensical for the line to go backwards horizontally — which means you can't possibly draw a "proper" S — you have to draw one that is tilted (that is, slanted) to the right.

These examples are in grayscale because you can actually apply curves separately in each color channel; having it gray makes the example more straightforward. I'm also making more extreme curves here than one would in real life. Anyway, here is a "neutral image", straight from RAW conversion, along with the straight-from-the-bottom-corner-to-top-corner "curve" (a line is a kind of curve!) that represents no adjustments:

neutral curve dialog neutral image

One can dramatically increase the contrast by compressing the range of levels, done easily by moving the start- and end-points inward. This is similar to (but more extreme than) what you will get by hitting "auto" in the Levels dialog:

straight curve dialog straight curve image

Woah! Contrast.

But in doing this, we've clipped the highlights and shadows significantly, discarding all detail in the bright and dark areas. An S curve makes this more graceful:

s-curve dialog s-curve image

Still a lot of contrast, but more detail in the shadows and brighter areas like the sky, and a much more graceful transition between them. Now, were I working on processing this for real, I wouldn't make the curve perfectly symmetrical like this, and I'd pay more attention to bringing out the detail on Anya's face. (In fact, I'd do that before grayscale conversion, but that's a whole 'nuther topic.)

And, as a final exercise, back to the original question, what happens if we try to draw a non-slanted S? We can't perfectly, because the retrograde lines are impossible, but we can make the center line straight and draw the top and bottom curves attached to that....:

silly attempt at a non-slanted s-curve yeah, you probably don't really want to do this

This does horrible, strange things to the tones in the bright and dark areas, and completely compresses the midtones. It's fundamentally non-nonsensical — although one can use the tool in this way, I can't imagine a case where it'd be actually useful. And that's why you want a slanted S: it happens to be the adjustment shape that increases contrast with graceful transitions.

mattdm
  • 143,140
  • 52
  • 417
  • 741
9

Use 2 points to create an 'S' shape in the curves editor.

See: http://www.chromasia.com/tutorials/online/curves/images/basic_s_curve.jpg

So basically the curves editor is a chart. For each pixel in an image, its brightness is represented by a number from 0 to 255. 0 is pure black, 255 is pure white, and everything in between is a shade of grade gray.

This works in color too because images have 3 channels of color red, green, and blue, and each of those will be 0-255. This is why you can apply curves to all channels at once, or red, green, or blue individually.

So, what does the curves actually do? By default, nothing. You start with a straight line on the chart, where every input is the same as the output. 0 is 0, 128 is 128, and 255 is 255. When you change the line, you are changing the output for any given input.

So, in the link I sent you can see that the input is 144 and the output is 189, this means when photoshop sees a pixel with a value of 144, it raises the output (brightness) to 189. Because the line is curved, everything around it is affected too, though becoming less affected as it gets farther away from your point.

So in a nutshell, for an s curve, you create 2 points, one in the highlights where you make bright pixels brighter, and one in the shadows, where you make dark pixels darker, while values in the middle remain mostly unaffected. This increases overall contrast in a pleasing way.

Hope that helps a little more.

mattdm
  • 143,140
  • 52
  • 417
  • 741
Michael Cook
  • 1,580
  • 11
  • 20