I was looking into something similar in the past - changing the order of the disks and the network cards for a monolithic kernel.
The order how the drivers are loaded gets decided during compilation - by initcall_levels (from lower to higher, include/linux/init.h) and then by
positions in the Makefiles.
I do not think there is much room for playing with initcall_levels - there are too many dependencies.
SATA level 4
in drivers/ata/libata-core.c
at subsys_initcall(ata_init)
MEGASAS level 6 in
drivers/scsi/megaraid/megaraid_sas_base.cat
module_init(megasas_init)
Pointers in System.map:
ffffffff829545cd t megasas_init
ffffffff8295547c t ata_init
ffffffff829e7688 t __initcall_megasas_init6
ffffffff829e8288 t __initcall_ata_init4
Changing the order in the Makefile should be an option, for example in drivers/net/ethernet/intel/Makefile switching the lines for e1000 and e1000e
will change the order for eth0 and eth1 (using net.ifnames=0)
obj-$(CONFIG_E1000) += e1000/
obj-$(CONFIG_E1000E) += e1000e/
So in drivers/Makefile moving ata before scsi
obj-$(CONFIG_ATA) += ata/
obj-y += scsi/
should change the order of the host controllers (SATAs first). Check by
ls -l /sys/class/scsi_host/
lsscsi
But even when having SATA as host0 the disks at LSI controller were found
first, I am not sure how the asynchronous SCSI probe works, but adding a
little delay (e.g. 700 ms) somewhere at the beginning of megasas_init()
in drivers/scsi/megaraid/megaraid_sas_base.c made the SATA disk to be /dev/sda
static int __init megasas_init(void)
{
int rval;
msleep(700);
...
I hope it does not cause any issues in the kernel, it worked for me but be
careful. Of course there are dependencies, not everything is possible. For example
I know when I tried mptsas (drivers/message/fusion/) before scsi, it would
compile, but the kernel immediately crashed at boot.
Hope this helps.
UUIDorLABELmight be an easier choice.PARTUUIDmay work if not, according to this thread. – ErikF Oct 24 '20 at 05:39/dev/sda). – Martin Vegter Oct 26 '20 at 05:31unbindandbindthrough the sysfs interface (in initramfs, when drives are not yet in use), but you really need to stop relying on drive names. There's too many cases where they can go out of order, so just don't rely on it. – frostschutz Oct 26 '20 at 19:58