The reason I ask is that when you need to launch 4400 satellites packing them tightly to get as many on a launch as possible is a huge component.
The possible numbers were discussed int this question:
From the PAZ-1 launch (Feb 2018) that launched MicroSat A and B, the first two test satellites, we got this image of the satellites on the adapter.
These do NOT look very optimized for packing, with bits sticking out.
The shiny thing in the middle is the adapter, the two satellites are on the side and you can see the main bus (Black) and then the antennas folded in.
For this launch, mass and space were not issues since PAZ is kind of small.
For first iterations it might make sense to simply test the core components and not focus on the origami aspects yet. But the question is, did they? Is that a correct assessment?